Asha Scientific Works
+91-9896380089
info@gexin.in
Mon - Sat: 9:00 - 18:30
Facebook-f
Twitter
Linkedin
Instagram
Menu
Home
About Us
Products
Biology instruments
Clinical lab instruments
Chemistry instruments
Civil and survey instrument
Laboratory plasticwares
Microscopes
Physics Intstruments
Pharmacy instruments
Poreclainware instruments
Soda glassware
Catalogue
Faculty microscopes
Student microscopes
Contact Us
GET QUOTE
SYNCHRONIZATION OF AN ALTERNATOR WITH BUS BAR THE APPARATUS CONSIST OF 3HP DC SHUNT MOTOR COUPLED TO THREE PHASE 1.5 KW SYNCHRONOUS GENERATOR COMPLETE WITH ONE SYNCHRONIZATION PANEL BOARD CONSIST OF 6 DARK LAMP MEATHOD & SYNCHROSCOPE
Enquire Now!
Description:
Related products
[SWINBURNE TEST ON A DC SHUNT MOTOR THE APPARATUS CONSIST OF PANEL BOARD, 2HP DC SHUNT MOTOR WITH LOADING ARRANGEMENT.] SWINBURNE TEST ON A DC SHUNT MOTOR THE APPARATUS CONSIST OF PANEL BOARD, 2HP DC SHUNT MOTOR WITH LOADING ARRANGEMENT
Read More
[TO FIND OUT REGULATION BY ZPF METHOD OF THREE PHASE ALTERNATOR. THE APPARATUS CONSIST OF 3HP DC SHUNT MOTOR MECHANICALLY COUPLED TO THREE PHASE 2.2 KW SYNCHRONOUS GENERATOR COMPLETE WITH PANEL BOARD RHEOSTAT & TACHOMETER.] TO FIND OUT REGULATION BY ZPF METHOD OF THREE PHASE ALTERNATOR. THE APPARATUS CONSIST OF 3HP DC SHUNT MOTOR MECHANICALLY COUPLED TO THREE PHASE 2.2 KW SYNCHRONOUS GENERATOR COMPLETE WITH PANEL BOARD RHEOSTAT & TACHOMETER
Read More
CALIBRATION OF SINGLE PHASE ENERGY METER WITH RESISTIVE LOAD
Read More
[NO LOAD TEST & BLOCK ROTOR TEST & V INVERTED V CURVE ON A THREE PHASE SYNCHRONOUS MOTOR THE APPARATUS CONSIST OF PANEL BOARD & 3HP THREE PHASE SYNCHRONOUS INDUCTION MOTOR WITH PRONNY DRUM LOADING ARRANGEMENT] NO LOAD TEST & BLOCK ROTOR TEST & V INVERTED V CURVE ON A THREE PHASE SYNCHRONOUS MOTOR THE APPARATUS CONSIST OF PANEL BOARD & 3HP THREE PHASE SYNCHRONOUS INDUCTION MOTOR WITH PRONNY DRUM LOADING ARRANGEMENT
Read More
✕